⚠ Current impacts Meetings Documents En Español A project of Westhaven Department of Public Works
I-82 Civic Greenway Project Sign up for updates →
↓ Below · Movement ↑ Above · Community

A safer highway below.
A greener Westhaven above.

We're rebuilding I-82 so traffic moves below ground and people can gather, walk, bike, and connect above — reconnecting neighborhoods the highway divided for 60 years.

Project status · live
Current phasePlanning & Environmental Review
Next milestoneCommunity Design Workshop
Upcoming meetingThu, April 18 Eastbank Community Center
Current impactsNo lane closures
1.2 mi
Interstate lowered into a tunnel
18 ac
New park built above
6
Neighborhood streets reconnected
2027–33
Construction timeline
The big idea

Move traffic below. Give the surface back to the city.

Today, I-82 is an open trench that splits Westhaven in two. The Civic Greenway lowers the interstate into a covered tunnel — then builds a continuous park, trails, and streets across the cap above it.

BELOW · MOVEMENT ABOVE · COMMUNITY
Why this project

Three problems. One solution.

The highway needs major repair

I-82's 1960s bridges, overpasses, and narrow crossings are aging and unsafe. Doing nothing means decades of patchwork closures.

The corridor divides neighborhoods

For 60 years the trench has cut Eastside neighborhoods off from downtown, schools, jobs, parks, and transit.

Westhaven needs public space

A growing, denser city has too little green space downtown. The cap creates 18 new acres in the heart of the city.

It reconnects the whole city

Streets, trails, transit, and stormwater all get rebuilt together — so the corridor works for the next 60 years.

What's being built

One project, rebuilt from the ground up.

Every piece of the corridor — below the surface and above it — is being modernized at the same time.

01

The tunnel

1.2 miles of I-82 lowered into a covered tunnel, with modern safety, ventilation, and emergency access — moving traffic out of sight and sound.

02

The park cap

A structural deck over the tunnel carries an 18-acre linear park — Westhaven Civic Green.

03

Streets

6 east-west neighborhood streets stitched back across the corridor.

04

Trails

Continuous walking and biking paths the length of the greenway.

05

Transit

New transit stops connecting the corridor to downtown and the medical district.

06

Stormwater & public spaces

Rebuilt stormwater infrastructure beneath new civic plazas, gathering lawns, and play areas above.

Timeline · 2027–2033

How the project unfolds.

1

Planning & review

2027 · now
2

Utility relocation

2028
3

Traffic shifts

2028–29
4

Tunnel construction

2029–32
5

Park deck

2032
6

Park opening

2033
Westhaven Civic Green

The park above the highway.

Westhaven Civic Green will be 18 acres of new public space stitched across the cap — trails, tree canopy, civic plazas, play areas, and gathering lawns connecting four neighborhoods at the center of the city.

18-acre linear park2+ miles of trailsTree canopyCivic plazasPlay areasEvent lawn
Aerial rendering of the future Westhaven Civic Green park Rendering · Westhaven Civic Green
Get involved

Help shape it — and stay ahead of the work.

This is a once-in-a-generation project, and it belongs to the people who live here. Here's how to weigh in and keep your trips clear.

Residents at an I-82 Civic Greenway public open house
Open houses, not hearings.Maps, renderings, and real conversations — translation and childcare provided.

Three updates a month. Zero surprises on your commute.

Construction alerts, detours, meeting invites, and park news — by email or text.

You can choose email or SMS, and unsubscribe anytime. Westhaven Department of Public Works.