A clearer, faster, more welcoming airport experience is on the way — and we'll keep your trip clear while we build it.
Moved to temporary curbside on Level 1. Follow the orange "Departures Drop-Off" signs.
Changed this monthUse the Daily Economy lot with a free, frequent shuttle while the new garage is built.
Enter through the covered walkway from the west. Staff are on hand to point the way.
Relocated to the West lot. Look for the shuttle marked "Rental Car Center."
Changed this monthOne consolidated checkpoint is open. Allow a few extra minutes during peak times.
Arrive 15 minutes earlier than usual. Flights and baggage claim are operating normally.
The Gateway Expansion rebuilds the parts of the airport travelers touch most — from the curb to the gate.
A brighter, more intuitive front door with a covered, weather-protected approach.
More counters, more kiosks, and shorter lines at peak travel times.
A consolidated, modern checkpoint built to move travelers through faster.
Room for more flights, more destinations, and more carriers as the region grows.
Larger carousels and a clearer layout so bags — and travelers — flow better.
+1,200 covered spaces and a consolidated rental-car center steps from the terminal.
A wider, weather-protected curb that keeps drop-off and pick-up moving.
A landscaped, welcoming plaza with seating, shade, and a sense of place.
Step-free routes, clearer signs, and energy-efficient systems throughout.
A light-filled terminal with a covered drop-off, a welcoming plaza, more gates, and clearer wayfinding — all framed by the mountain ridges that give the airport its name.
Rendering · Future terminal entrance
A project this size belongs to the whole region. Here's how to follow the work and weigh in.
No — flights, gates, and baggage claim are operating on their normal schedule. The changes are on the ground: drop-off, parking, the entrance, and rental cars.
At the temporary curbside on Level 1. Follow the orange "Departures Drop-Off" signs, or check the live impacts page before you leave home.
Use the Daily Economy lot and the free, frequent shuttle to the terminal while the new garage is built. The cell-phone lot is unchanged.
Plan to arrive about 15 minutes earlier than you normally would, especially during morning and evening peaks.
The full Gateway Expansion opens in 2030, with the new parking garage and several improvements opening sooner.
Construction impacts, detours, meeting invites, and milestones — by email or text.
Choose email or SMS, unsubscribe anytime. Summit Ridge Regional Airport Authority.