I-82 Civic Greenway Project

A safer highway below. A greener Westhaven above. A branded microsite and communications system for a once-in-a-generation highway tunnel and park-cap project.

The I-82 Civic Greenway is the Westhaven Department of Public Works' biggest project ever: lowering 1.2 miles of interstate into a covered tunnel and building an 18-acre park — Westhaven Civic Green — above it, reconnecting six neighborhoods the highway divided for 60 years. A project this big, disruptive, and long can't live as one page on the department site. So Optimistic gave it its own public-facing identity: a project brand, an engagement microsite, and a full print and field communications system to help residents understand what's happening, why it matters, and how it affects them. This is a concept piece, built to demonstrate our approach; the project is illustrative.

SectorCivic infrastructure · Public engagement
RoleDigital Clarity Partner
Engagement2027
i82greenway.org
I-82 Civic Greenway Project, homepage
WCAG 2.1 AA
Public engagement microsite
Project Brand IdentityPublic Engagement MicrositePrint & Field CommunicationsConstruction NoticesMeeting MaterialsWayfindingAccessibility (WCAG 2.1 AA)Project Brand IdentityPublic Engagement MicrositePrint & Field CommunicationsConstruction NoticesMeeting MaterialsWayfindingAccessibility (WCAG 2.1 AA)

We don't announce a billion-dollar project. We make it understandable, visible, and human.

The challenge

In the 1960s, I-82 was built through the center of Westhaven as a symbol of access and progress. Over time it became a dividing line — cutting older Eastside neighborhoods off from downtown, schools, parks, jobs, and transit, and leaving aging bridges, noise, and underused land along its edge. The Civic Greenway project modernizes the highway below and reconnects the city above. But a $1.6 billion, six-year project is also a communications problem.

Years of public meetings, construction updates, detour notices, environmental review, neighborhood engagement, business-access concerns, funding questions, and park-design workshops were ahead. A normal government logo can't carry that. The project needed an identity that could make a massive, disruptive infrastructure project feel understandable, visible, and emotionally clear — and a place to live that wasn't buried in the department site.

The approach

One journey, applied to I-82 Civic Greenway Project.

01

A project brand, not a department logo

We built a public-facing identity around one idea — "Below: movement. Above: community." A tunnel-and-green-arc mark, a hopeful greenway palette, and a sub-brand for the park itself: Westhaven Civic Green.

Project brandPark sub-brandBig idea
02

An engagement microsite

A standalone microsite linked from the department site, built around what residents ask: what's being built, what's the impact right now, when are meetings, and what will the park be — led by a live status card and a plain-language cross-section.

MicrositeLive statusPlain language
03

A field communications system

The brand extends into a project brochure, public-meeting posters, weekend-closure construction notices, business-access door hangers, a construction-fence banner, and a project fact sheet — so the same clarity reaches people at the corridor.

Print systemConstruction noticesWayfinding
04

A messaging system for trust

Consistent message frames for every audience moment: meetings ("Help shape the park"), construction ("Your route will stay clear"), business access ("Local businesses remain open"), and equity ("Reconnecting neighborhoods the highway divided").

Message framesEquityCommunity-first
Brand & identity

A project brand that does what a government logo can't.

The department has its official identity. The project needed something more emotional and transformational — an identity that could carry years of meetings, notices, and change while keeping people hopeful and informed. So we built a public-facing campaign brand around one line: "Below: movement. Above: community."

The mark pairs the tunnel/highway below with a green park arc and trees above — the same idea as the project itself. The park earns its own sub-brand, Westhaven Civic Green, so the place people will gather has a name from day one.

The markA sand tile holding the highway/tunnel below and a green park arc with trees above — "Below: movement. Above: community," with the 82 woven in.
The paletteTunnel Navy and Transit Blue for movement; Greenway Green and Pathway Sand for the park above; Signal Yellow for wayfinding; a Brick accent for warmth.
The typeHanken Grotesk for confident, friendly headlines; Inter for body — approachable and public, not bureaucratic.
The voiceHopeful and plain. "We're rebuilding I-82 so traffic moves below and people can gather above." Emotionally clear, never political.
The brand book, dissected

Inside the I-82 Civic Greenway brand book.

A transformational project identity — a tunnel-and-park mark, a hopeful greenway palette, friendly type, and a park sub-brand named Westhaven Civic Green.

Logo

The mark holds movement below and community above — never flip them. The green park arc always sits on top of the navy corridor. The park sub-brand (Westhaven Civic Green) uses its own green roundel.

Primary project lockup
Primary project lockup
Tunnel + park mark
Tunnel + park mark
Park sub-brand · Westhaven Civic Green
Park sub-brand · Westhaven Civic Green
Color
Tunnel Navy#123047Below · structure, headlines
Greenway Green#3F8F5FAbove · the park & surface
Transit Blue#0077B6Movement, links, transit
Signal Yellow#F9C74FWayfinding & alerts
Pathway Sand#EFE6D2Warm surfaces, paths
Brick Accent#B85C38Neighborhood warmth
Typography
Display · ExtraBold · Hanken Grotesk
A greener Westhaven above
Heading · Bold · Hanken Grotesk
Help shape Westhaven Civic Green
Eyebrow · Uppercase · Hanken Grotesk
Community Design Workshop
Body · Regular · Inter
We're rebuilding I-82 so traffic moves below and people can gather, walk, bike, and connect above — reconnecting neighborhoods the highway divided.
Voice
We sayYour route will stay clear.
NotAnticipate intermittent corridor capacity reductions.
We sayLocal businesses remain open.
NotCommercial access continuity will be maintained.
Open the full brand book ↗
The communications system

One project brand, from the website to the fence.

A project this visible needs to communicate everywhere — on the microsite, at a public meeting, on a weekend-closure notice, on a door hanger for a local shop, and on the construction fence itself. Same mark, same hopeful voice, same clarity, whether it's the homepage status card or a printed detour notice.

MicrositeStatus cardBrochureMeeting postersConstruction noticesDoor hangersFence bannersFact sheetWayfindingPark sub-brand
Project overview brochure
Project overview brochure"A safer highway below. A greener Westhaven above." — the tri-fold that explains the whole project.
Construction-fence banner
Construction-fence banner"Future Home of Westhaven Civic Green" — branding the corridor while it's under construction.
Public meeting poster
Public meeting poster"Help Shape Westhaven Civic Green" — the community design workshop invite.
Construction notice
Construction notice"I-82 Weekend Closure" — urgent, official, and still on-brand.
Business-access door hanger
Business-access door hanger"Businesses Along I-82 Remain Open" — reassurance for local shops during construction.
Project fact sheet
Project fact sheet"I-82 Civic Greenway at a Glance" — the data, timeline, map, and partners on one page.
What’s inside

A communications system for a once-in-a-generation project

Below / Above, made clear

A plain-language cross-section shows the whole idea in one image: traffic moves below in a tunnel, the city gets the surface back as a park.

Live project status

A status card leads every visit — current phase, next milestone, the upcoming meeting, and whether there are impacts right now.

What's being built

Tunnel, park cap, reconnected streets, trails, transit, stormwater, and public spaces — each explained as rider and resident impact.

A timeline you can follow

Planning → utilities → traffic shifts → tunnel → park deck → park opening, with the current phase highlighted.

Westhaven Civic Green

The 18-acre park gets its own sub-brand and section — trails, tree canopy, civic plazas, and gathering lawns above the tunnel.

Get involved, not talked at

Open houses, a park-design survey, live traffic & detours, and a question form — with translation and childcare provided.

Built for public trust

A billion-dollar project, made human.

1.2
Miles of interstate lowered into a tunnel
18
Acres of new park above (Civic Green)
6
Neighborhood streets reconnected
AA
WCAG 2.1 accessibility

A public-engagement platform that leads with clarity: residents see the big idea, the current impact, and how to get involved before any jargon. The project, agencies, and data shown here are illustrative concepts.